Scenario Library (10)
Bands: A = 8–10 steps, B = 15–20, C = 25–30, D = ~40. Mix of service, healthcare, manufacturing, and transactional flows.
Select a scenario to begin
VA = Value Added
BVA = Business-Value Added
NVA = Non-Value Added
Value-Added ratio = Value-Added Processing Time (VA PT) / Lead Time (LT). Lead Time (LT) is
the sum of Processing Time (PT) and Waiting Time (WT). Queue ratio = Waiting Time (WT) / Lead Time (LT).